Site visit
2:20pm Contractor was loading out old bridge and hauling off, surveyor was onsite to stake Bridge and offsets Checked the traffic control, a couple signs will need to be fixed or relocated. This sign will need to be moved back one road do to the one it is at is a dead end road. The wind had taken this one over, Contractor will fix it before he leaves today.